Больше информации по резюме будет доступно после регистрации
ЗарегистрироватьсяCandidate
Male, 52 years, born on 14 July 1972
Egypt, willing to relocate (Russia), prepared for business trips
Civil Inspector - Civil General Foreman - Civil Supervisor - Surveyor
80 000 ₽ in hand
Specializations:
- Other
Employment: full time
Work schedule: full day
Work experience 18 years 8 months
January 2010 — December 2012
3 years
Tangram Consulting
UAE
Civil Inspector
Projects: Maintenance of Villes and Houses For Bdaa Zayed city.
Concrete structural , Block Buildings , including maintenance, in internal and External works .
February 2007 — January 2009
2 years
Otak International
UAE
Civil Inspector
Projects: The 400 Villes For Golf Gardens Residential Communitiy.
I Responsible For 116 Villes Abu Dhabi .
Work Include Inspection,Continuation For All Works From Excavation To Finishing Works.
October 2005 — September 2007
2 years
Group 3
UAE
Site Engineer Supervisor
Projects:
The Crystal Tower for H.H Sheikh Kkalifa Bin Zayed. - Abu Dhabi
3B + G + M+18 floors + Penthouse + Roof.
Work Include Excavation, piling, Basement, concrete structure, Finishing, electromechanical and External Finishing works.
September 2001 — September 2005
4 years 1 month
Construction General
UAE
General Foreman
Projects:
1- Al Marwa Residential Tower for H.H Sheikh Abdula Bin Moh. Bin Khalid - Construction cost Dhs 130 M.
3B + G + M+21 floors + Roof - in Abu Dhabi
2- Residential 5 no Buildings in Moroor street.
G + M+5Floors + Roof - in Abu Dhabi
Work Include Excavation, piling, concrete structure
finishing, Electromechanical works,
May 1996 — April 2001
5 years
Starfish Contracting & Maintenance Co.
UAE
General Foreman
Projects:
1- Swihan Military Camp Maintenance
Concrete structure Block Buildings. Including maintenance and External finishing works.
2- Al Nahyan Military Camp Maintenance.
Concrete Buildings and maintenance and External finishing works.
3- Nad Shibba Military Camp - Dubai
Construction of Concrete Block Buildings.
March 1994 — April 1996
2 years 2 months
Bin Karam Construction Co.
UAE
Civil Works General Foreman
Projects:
1- Construction of 150 Local Houses in Swihan for Abu Dhabi Works Department.
Concrete structure and finishing works.
Work also includes Boundary wall and footpath, curbstone...
2- Construction of 50no Low Rise Buildings.
Concrete, block works, waterproofing, External finishing works.
November 1992 — November 1993
1 year 1 month
ARAB Contractors O.A.O
Egypt
Civil General Foreman
Construction of 50 plot Low Raises Building in 15 may City .
Concrete structure , Block Buildings , water supply , sewerage , power cables and External finishing works .
About me
* Communication skills in both Arabic,English & Russian .
* Familiarity withe multitask work environments .
* Self-directed and life long learner .
* Familiarity of Computerisation , Autocad .
* Intercommunication skills withe group work and Subcontractors .
* Controller site and Production Supervisor .
* Good experience in construction & consultancy of projects High rise Residential About Excavation , Site Preparation , Concrete works & Finishing works .
Higher education
1992
Higher Technical institute for Survey
Higher Technical institute for Survey, General Surveying Courses
1990
المدرسة الثانوية المعمارية
المدرسة الثانوية المعمارية, دبلوم عمارة عامة
Languages
Citizenship, travel time to work
Citizenship: Egypt
Permission to work: Egypt
Desired travel time to work: Doesn't matter