Больше информации по резюме будет доступно после регистрации
ЗарегистрироватьсяWas online more than two weeks ago
Candidate
Male, 36 years, born on 28 April 1989
Egypt, not willing to relocate, not prepared for business trips
Инженер по оффшорному и сухопутному бурению / Drilling Engineer
2 000 $ in hand
Specializations:
- Other
Employment: full time
Work schedule: full day
Work experience 12 years 5 months
February 2013 — currently
12 years 5 months
Seenopex Oil Services
Drilling engineer
Well Site Drilling Supervisor and Assistant Project Manager for water well drilling project in National Project for Egyptian Armed Forces in Frafra Oasis area.
Responsible for all rig operation needs and logistics affecting rig time cost saving.
Well program design, drilling operations and equipment problems analysis.
Arrangement for all interrelated operations to save time and cost and reach best performance.
Working with Baker Hughes Integrated Operations (BHIO) and Lukoil Mid. East (LME) operators in West Qurna#2-Basrah-Iraq Project as a Work-Over Rig Manager (Rig PR#2, 1000 HP).
Planning organization and coordinating rig operations with all concerned parties.
Organize the operations of the all related staff like engineers, workers & contractors each with specified role and got overview for others roles to avoid roles interruption.
Preparing all drilling rigs technical and commercial tender documents to get the client satisfaction.
Ensure that the operation is conducted in the most cost effective manner through periodically review on cost project trend.
Leading the company Rig Audit Team assigned for accepting new rigs to be ready for spud as third party inspectors.
Manage the program in accordance with approved client programs, HSE policies, standards and system to fully meet project objectives ad best performance.
Providing all routine drilling and cost control reports required by the operator and the regulatory bodies in a professional standard.
Drilling Quality Control System Generator as of forms and procedures for obtaining the best performance and quality.
Arrangement for rig move plan to get rig tear down – rig move – rig up in the most definite time.
Provide direction to major engineering projects and technical services that require unusual analysis and solution
Conduct research to solve drilling problems and recommend ideas to enhance drilling performance
Perform responsibilities of preparing drilling procedures, developing and implementing drilling programs
Skills
Skill proficiency levels
Higher education (bachelor)
2011
Petroleum & Mining Engineering Faculty
Petroleum Engineering, Drilling of Oil and Gas Wells
Languages
Citizenship, travel time to work
Citizenship: Egypt
Permission to work: Russia
Desired travel time to work: Doesn't matter