Больше информации по резюме будет доступно после регистрации

Зарегистрироваться

Candidate

Male, 43 years, born on 31 January 1982

Egypt, willing to relocate, not prepared for business trips

process engineer

2 000 $ in hand

Specializations:
  • Other

Employment: full time

Work schedule: full day

Work experience 19 years 10 months

August 2005currently
19 years 10 months
DANA GAS /EL-WASTANI PETROLEUM CO.

Egypt

GAS ENGINEERING SECTION HEAD
I have Bachelor Degree in Chemical & Petroleum Refining Engineering then Diploma of Higher Studies in Applied Chemical Engineering added to 10 years’ experience in Natural Gas field operations and related Projects EPC activities in EL-WASTANI Petroleum CO., My work experience go through fourth phases as the following: Last: Gas engineering section head, August, 2014, Cairo Egypt  Participate in Pre-Qualification evaluation team of rental standalone Process facilities  Participate in technical evaluation team of temporary separation facilities on well head  Participate in preparation of scope of work to purchase farskour nodal compression and temporary separation facilities on well head  Participate in prepare SOW of Produced water tank repair and tender offers technical evaluation  Participate in technical evaluation of hot tapping of access fittings for corrosion monitoring  Participate in LPG integrated plant SIL study to evaluate the required SIL for additional layers of protection.  Participate in negotiation team of waste water transportation, treatment and diposal.  Participate in Open drain system engineering and HAZOP session  Particpate in engineering review team of new additional equipments in LPG plant as Cold box, Regeneration gas heater, sales gas reciprocating compressor, coalesce filter and particulate filter  Participate in incident investigation team in two HIPO incidents  Prepare presentation highlight weekly production and operational issues for senior Management team included EL-wastani chairman and executive general managers  Participate in preparation operation budget and forecast projects needs  Participate in create and apply management system in the field of Quality, environmental, Health and safety to achieve ISO 9001, 14001, OHSAS 18001.  Participate in purchasing new cold box (plate Heat exchanger) from chart co, 2015.  Participate in Shutdown Lesson learning session,2014, JW Marriott, DANAGAS, Cairo  Participate in major shutdown for LPG plant to complete increasing capacity project outstanding items, 2014, Damietta.  Participate in EPC for Increasing capacity of LPG recovery plant, 2013, ENPPI, Cairo started from scope of work, engineering documents review, procurements and construction included attended factory acceptant test, as increase LPG plant capacity, new cold box, Molecular sieve desiccant replacement as • Factory acceptance test (FAT) on sonic flare tip, 2013, GPA, ITALY • Perform Many modification on Plant Module to improve LPG plant recovery using Aspen HYSYS simulation.  Perform in-house training on Process simulation for engineers  Participate in process safety activities as HAZID, HAZOP studies, SIL reviews and project execution risk register as • LPG Plant REHAZOP, 2014, UNEPP, Cairo • New compression station HAZOP, 2013, UNEPP Cairo • SALMA, TULIP & SAEN pipelines HAZOP,2013 ENPPI Cairo • SALMA, TULIP & SAEN Project risk register, 2013, DANAGAS, Cairo • LPG plant increasing capacity HAZOP, 2012, ENPPI Cairo  Perform in House and out training on Process safety studies for engineers  Perform asset integrity activities as Pipeline protection system to achieve zero pinhole, Corrosion under insulation, cold repair, and traditional inspection for produced water tank and robotic inspection for fire water tank as well as participate in produced water tank repair. Third : plant manager, August, 2011, Damietta Egypt  Perform field management activities as delegation for 2 years and lead all departments in Lean gas dehydration process use TEG. Second : plant operation engineer, , August, 2008, Damietta Egypt  LPG Plant operation, troubleshooting, products dispatching and participate in major shutdowns, 2006 till 2011, EW field, Damietta  Participate in engineering documents review of nodal compression stations,2009, WASCO, Cairo First: plant commission and startup engineer, August, 2005, Damietta Egypt  Nodal compression process commissioning, start up and performance test, 2008, EW field  LPG recovery facilities commissioning, start up and performance test, 2006, EW field, Damietta  Joule Thomson plant commissioning , start up and operation, 2004, EW field, Damietta  Added to review all process deliverables and attend all construction meeting.

Skills

Skill proficiency levels
PROJECT COMMISSIONING AND START UP
Hysys process simulation
Preparing Presentations
Presentation skills
PLANT OPERATION

Higher education (bachelor)

2003
cairo university
PETROLEUM REFINING AND CHEMICAL ENGINEEING, GAS PROCESSING

Languages

ArabicNative


EnglishB2 — Upper Intermediate


Citizenship, travel time to work

Citizenship: Egypt, Russia

Permission to work: Egypt, Russia

Desired travel time to work: Doesn't matter